By now, you're probably wondering when they will repair the street since this winters major construction street repair.  If you didn't know, a new main sewage pipe was installed by DEP, hopefully correcting all the sink holes that have plagued our street for so long.  Block President, Tiffany Murchinson assures us that the re-paving of street and sidewalks will take place this summer.  Now, if can we have them clean sweep the entire block from all the debris and dust they left behind.